FG Suspends Lagos-Ibadan Expressway Bridge Project After 20-Hour Gridlock

The Federal Government has suspended the construction of a pedestrian bridge at the Aseese section of the Lagos-Ibadan Expressway following a gridlock that left motorists stranded for more than 20 hours.

The project, being handled by the Federal Ministry of Works in collaboration with CBC Construction Company, was scheduled to run from Wednesday, November 18, to Sunday, November 22, to allow the installation of the pedestrian bridge.

The Ogun State Traffic Compliance and Enforcement Agency had earlier announced a temporary diversion of inbound Lagos-bound traffic towards the Lagos carriageway at Aseese, with motorists expected to rejoin their normal route at an exit point opposite Christ Embassy.

However, the diversion triggered a prolonged traffic jam that began around 2pm on Wednesday and lasted until about noon on Thursday.

Several motorists were stranded for hours, while some commuters abandoned their vehicles and trekked long distances to their destinations.

PUNCH Metro reported that some commuters who left Ibadan shortly after 11am did not arrive in Magboro until about 5.30pm. Another motorist said he spent eight hours travelling from Mowe to Magboro.

Commercial motorcycle operators also increased their fares during the gridlock, with one rider reportedly demanding N6,000 for a trip from Mowe to Ibafo.

The congestion was further worsened by motorists who drove against traffic in attempts to escape the gridlock.

The Special Adviser to President Bola Tinubu on Media and Communications, Sunday Dare, criticised the timing of the construction work, questioning why the contractor carried out the exercise during peak traffic hours instead of at night.

In a Facebook post on Wednesday night, Dare said he had spent more than five hours in the gridlock while travelling from Lagos to Ibadan for media appearances ahead of the APC presidential rally scheduled for Saturday.

He wrote, “It beats me why a Chinese Contractor would choose the busiest hours of vehicular traffic to construct the bridge and road around this exit point. Stranded cars, thousands of people trekking to get home.

“What happened to doing construction work during the off-peak hours when traffic is lean? This is unnecessary pain. It needs to be corrected.”

Other road users also shared their experiences on social media, with one Facebook user, Adiatu Adeoye, saying her truck spent 12 hours in the gridlock.

Another user, Ojewale Adewale, said he arrived at the Interchange from Abeokuta at 3pm but did not get home until 9.59pm.

A commuter, Kemi Adewuyi, said she encountered the traffic on her way home from work on Wednesday and again while travelling to work on Thursday morning.

On Thursday, some commuters abandoned their journeys after commercial drivers increased fares from Mowe to Berger to as much as N3,000, compared with the usual N700 to N800. Commercial motorcyclists reportedly charged up to N5,000 for the same journey.

Traffic be

Leave a Reply

Your email address will not be published. Required fields are marked *